4.3 Minimal first-day construction
Preface node
heading:4-3-minimal-first-day-construction:1344
What this page is
This is generated FPF reference text from the specification preface or supporting sections. It helps interpret FPF; it is not FPF Reference product documentation.
Methodology
Use it to understand how the specification wants to be read, then return to a route, pattern, or work packet for active work. Cite generated IDs only when the wording changes the task decision.
Content
- Declare CG‑Frame (what “quality” means; admissible units and scales) and ReferencePlane.
- Pick 2–4 Q components + a simple DescriptorMap (≥2 dims) for N/D; publish editions.
- Choose an E/E‑LOG policy (explore↔exploit budget); record policy‑id.
- Apply G.5 selection/dispatch with parity pins. Keep any consumed
FrontorArchiveidentified as the source set. For a set outcome, returnShortlistorRankedShortlistfor retained alternatives, orJointUseSetwhen all named members are included for one named use. Return a handoff, abstain, or escalation when that is the actual G.5 outcome. - Keep the actual G.5 outcome's required content and basis pins. Publish that result only when the receiving use calls for publication, with its applicable PathIds/PathSliceId. Add a UTS row for a named governed value only when F.17's independent naming and reuse conditions hold; otherwise reuse its existing designation. Follow the outcome's continuation or stop. An Illumination Map remains report‑only telemetry by default.
Last Updated: 2026-09-10 — upstream FPF commit a87d0ef4 (github.com/ailev/FPF)